Layout

Layout editor

Walking is work you can see. Put stations, paths, and task numbers on one layout the team can stand around in a kaizen.

Layout editor

Layouts that nobody can update

Many plants still review space on a whiteboard photo, a CAD print that is out of date, or a sketch only one engineer understands. Extra walking stays hidden until someone follows the operator with a marker.

  • Spaghetti is drawn once, then lost in a photo album
  • Task numbers on the sheet do not match anything on the floor plan
  • The instruction shows hands, not where the step happens
  • A layout change means redrawing from scratch

How it works

From the floor to a usable study

  1. 1

    Draw the workplace

    Place stations, equipment, and space so the cell is readable in a meeting โ€” not only in CAD.

  2. 2

    Put each task on the layout

    Use the study numbers so the sequence on the sheet maps to a place on the floor.

  3. 3

    Trace the path

    Build a spaghetti diagram of walking. Extra motion becomes obvious before you freeze the standard.

  4. 4

    Issue it with the instruction

    Operators see where the step happens, not only what to do with their hands.

What you get

Outputs you can take to the team

A living cell drawing

Update the same file when you move a bench instead of photographing a new whiteboard.

Spaghetti you can edit

Walking paths stay in the layout, ready for the next kaizen.

Task numbers on the plan

Each studied step has a place, so the team can point at the work.

A picture for the standard

The layout travels with world-class work instructions instead of living in a separate folder.

What a workplace layout is for

A layout shows stations, material, people, and paths. Combined with a time study it answers whether the method is short because the work is good โ€” or because walking was never counted.

Built for industrial engineering reviews

Use it in a standup at the cell. Zoom, move a station, redraw a path, and keep going. You do not need a separate drawing package for that conversation.

FAQ

Questions, answered

No. It is a shop-floor layout editor for industrial engineering: stations, paths, spaghetti, and task numbers next to the study and the instruction.

A drawing of the walking path through the cell. Extra travel shows up as a tangle you can simplify before you lock the standard.

Place each task on the layout by its study number so the sequence on the work instruction maps to a location.

Yes. Editing runs on the workstation, like the rest of Lean Analyzer.

Study the work on the workstation

First month free. Desktop app. Cancel anytime.

More in the app